Configure
Set the project up once.

Define layout, sequence, testing and evidence before work reaches the field.
Everyone starts from the same definition.
For ground-engineering delivery.
One connected workflow from project setup to a smarter next project.


Field records arrive fragmented—or go missing.
Project managers spend hours chasing, entering and reconciling the data into reports.
Engineers receive delayed, reconstructed reports that are hard to verify.
Live, structured field data leaves the PM to review exceptions and release a trusted report.
Set the project up once.

Define layout, sequence, testing and evidence before work reaches the field.
Everyone starts from the same definition.
Record the work where it happens.

Capture field activity in simple workflows with the project context already in place.
The operator records once. The PM sees it live.
Verify and release.

Submitted records enter QA before release to the engineer or client.
The client receives a confirmed report.
Start the next project smarter.

Confirmed records improve future project layouts, checks and recommendations.
Every confirmed record improves what comes next.
Built first for anchoring and drilling. Adaptable to adjacent ground-engineering work.
Hole drilling, bolt installation, grouting and proof testing.
Drill progress, depth tracking and lithology logging.
Spray records, thickness checks and test panels.
Mesh installation, anchor points and inspection records.
Drain installation, flow checks and as-built records.
Pile installation, depth verification and wall records.
The idea for TACEDGE emerged during the 2019 Whakaari / White Island recovery operation.
A complex multi-agency plan was drawn on a whiteboard and condensed into a single PowerPoint slide.
What was missing was one shared system to configure the plan, capture field activity as it happened, and confirm a trusted record.

Bring a current project or reporting problem. In 15 minutes, we’ll show how TACEDGE would structure the workflow.
Bring your engineer if useful.